Edge Device Models
Industrial PMR consists of strictly two device models, representing the evolution of our edge monitoring technology:The
ipmr223m-v1 is ideal for machines requiring purely operational cycle counting, stroke timing, and run/idle status. The ipmr226 is the refined all-in-one standard for heavy machinery (such as injection molding machines, presses, and extruders) where comprehensive 3-phase electrical monitoring and production output must be captured simultaneously in a single unit.Physical Enclosure & Terminal Interfaces
Both models are housed in standard 35mm DIN-rail mountable, flame-retardant industrial enclosures. Below are the physical terminal configurations for each model:1. ipmr223m-v1 (Older, Simpler Node)
Designed for streamlined machine cycle counting with minimal cabinet wiring footprint:
2. ipmr226 (New, Refined Controller with Integrated Power Analyzer)
Engineered for simultaneous 3-phase energy auditing and comprehensive production monitoring:
External Wiring Standards
Digital Machine Pulse & Cycle Inputs (Both Models)
- Sensor Compatibility: Accepts standard 5V to 24V DC PNP/NPN proximity sensors, optical photo-eyes, or mechanical limit switches.
- Optoisolation: All digital inputs feature 2.5 kV optical isolation to safeguard internal logic circuitry from factory ground loops and inductive spikes.
- Wiring: Connect the sensor switched signal lead to
IN1(orIN2) and the sensor reference return toGND.
3-Phase Power Analyzer Connections (ipmr226 Exclusively)
- AC Voltage Sensing (
L1, L2, L3, N):- Tap off downstream of the main machine isolator through a dedicated 3-pole 2A or 6A miniature circuit breaker (MCB).
- Phase lines , , , and Neutral () enable continuous line-to-neutral and line-to-line true RMS voltage monitoring.
- Current Transducers (
CT-R, CT-Y, CT-B):- Clamp split-core CTs around the insulated phase conductors supplying the machine load or main motor.
- Orientation: Ensure the directional arrow on each CT points toward the load (machine), away from the supply breaker.
- Connect the CT secondary leads to the corresponding terminals (
CT-R,CT-Y,CT-B) and commonGND.
Diagnostic LED Status Indicators
Both edge controllers feature front-panel multi-color diagnostic LEDs for rapid visual inspection:Physical Installation Guidelines
- Power Isolation: Always de-energize and lock out the machine main electrical panel before opening the cabinet doors.
- DIN Rail Placement: Mount the node on a standard 35mm DIN rail with a minimum 50mm clearance from high-frequency Variable Frequency Drives (VFDs) and heavy contactor coils to prevent inductive electromagnetic interference (EMI).
- Antenna Routing: For steel electrical cabinets, route the external high-gain antenna through an enclosure knockout to ensure strong Wi-Fi signal propagation (-65 dBm or better).
- BLE Commissioning: Follow the BLE Provisioning Guide to configure plant Wi-Fi credentials from a mobile phone or tablet without connecting physical serial cables.